← 論文一覧に戻る

系統連系グリーン水素・アンモニアパークの電力バランスと性能評価

Power Balance and Performance Evaluation of Grid-Connected Green Hydrogen-Ammonia Parks (原題)

Miao Shu, Yu-Hao Luo, Hao-Qi Hu, Qing-Jie He

ITM Web of Conferences📚 査読済 / ジャーナル2026-01-01#水素Origin: CN経営インパクト: コスト削減対象セクター: power
DOI: 10.1051/itmconf/20269204027
原典: https://doi.org/10.1051/itmconf/20269204027
📄 PDF

🤖 gxceed AI 要約

日本語

風力・太陽光の変動性と電解・アンモニア合成の硬直負荷の時間ミスマッチを扱うため、パークの時間別電力バランスモデルを構築。グリーン電力適合指標を組み込み、エネルギー流・政策適合・生産経済性を統合評価した。典型日では再エネ発電603.45MWhが消費558.72MWhを上回るが、系統からの購入172.04MWhと逆潮流216.77MWhが発生。グリーン電力比率のみ基準を満たし、自家消費率・逆潮流比率は未達、グリーンアンモニア単価は4,322.34元/トンとなった。

English

This paper builds an hourly power-balance model for a grid-connected green hydrogen-ammonia park, integrating green-power compliance indicators with energy flow and production economics. On a typical day, renewable generation (603.45 MWh) exceeds consumption (558.72 MWh), yet temporal mismatch forces 172.04 MWh grid purchases and 216.77 MWh feed-in. Only the green-power proportion meets official standards; self-consumption and on-grid ratios fall short, and green ammonia costs 4,322.34 yuan/ton. Source-load temporal mismatch is identified as the core bottleneck.

Unofficial AI-generated summary based on the public title and abstract. Not an official translation.

📝 gxceed 編集解説 — Why this matters

日本のGX文脈において

水素・アンモニアの大規模導入を進める日本のGX政策(水素基本戦略、GX推進法)に対し、再エネ調達と系統連系の時間ミスマッチが事業性・政策適合性を左右する点は示唆的。国内のグリーン水素・アンモニア拠点の設計・評価に応用可能。

In the global GX context

As global green hydrogen and ammonia projects scale, this work highlights that hourly temporal matching—not annual volume—determines both compliance and cost, relevant to emerging green-hydrogen certification and additionality rules in the EU and beyond.

👥 読者別の含意

🔬研究者:時間別電力バランスと政策適合指標を統合した評価枠組みは、水素・アンモニアパークの運用最適化研究の基礎になる。

🏢実務担当者:再エネ調達と系統連系の時間ミスマッチがコストとグリーン認証に与える影響を定量化する際の実務的モデルとして活用できる。

🏛政策担当者:グリーン電力基準の設計において、年間量だけでなく時間別の自家消費・逆潮流比率を考慮する必要性を示す。

📄 Abstract(原文)

With the rapid development of green hydrogen and ammonia industries, grid-connected green power direct connection parks have become key carriers for renewable energy consumption and industrial decarbonization. However, the inherent volatility of wind and photovoltaic power, coupled with the rigid load characteristics of electrolyzers and ammonia synthesis units, leads to prominent temporal mismatches and complicated grid interaction issues. To address this problem, this paper constructs a high-resolution hourly power balance model for the park. Different from conventional daily-scale evaluation methods, this work innovatively integrates green power compliance indicators into the power balance analysis framework, and realizes the joint assessment of energy flow, policy compliance and production economy. Typical day calculation results show that the total renewable generation of the park is 603.45 MWh, exceeding the total electricity consumption of 558.72 MWh. Affected by temporal mismatch between generation and load, the park purchases 172.04 MWh electricity from the grid and feeds 216.77 MWh surplus power back to the grid. In terms of green power assessment, only the green power proportion satisfies the official standard, while the renewable self- consumption ratio and on-grid ratio fail to meet requirements, and the unit production cost of green ammonia is 4,322.34 yuan per ton. The research verifies that source-load temporal mismatch is the core bottleneck restricting the park’s compliance operation and economic benefits. The established model fills the research in refined hourly operation evaluation of green hydrogen-ammonia parks.

🔗 Provenance — このレコードを発見したソース

🔔 こうした論文の新着を逃したくない方は キーワードアラート に登録(無料・3キーワードまで)。

gxceed は公開メタデータに基づく研究支援データセットです。要約・翻訳・解説は AI 支援で生成されています。 最終的な解釈・検証は利用者が原典資料に基づいて行うことを前提とします。