本論文は、スペインのアストゥリアス水素バレープロジェクトを事例に、再生可能水素生産に循環経済原則を適用する方法を検討する。石炭火力発電所の既存インフラを転用することで、CO2排出削減や水消費低減などの環境便益と、許認可迅速化や投資コスト削減などの経済便益が相互に強化されることを示す。循環経済戦略がプロジェクト実現性を高め、EUの水素バレー目標に貢献することを明らかにする。
English
This chapter uses the Asturias H₂ Valley project in Spain as a case study for applying circular economy principles to renewable hydrogen production. By repurposing coal-fired power plant infrastructure, it achieves environmental benefits (CO2 reduction, lower water use) and financial benefits (faster permitting, reduced investment costs) that are deeply interconnected. The study shows how circularity strategies enhance project feasibility and support EU hydrogen valley objectives.
Unofficial AI-generated summary based on the public title and abstract. Not an official translation.
📝 gxceed 編集解説 — Why this matters
日本のGX文脈において
日本でも水素バレー構想(福島など)が進行しており、既存インフラ転用によるコスト削減や許認可迅速化の具体的事例は参考になる。ただし、スペインの制度的枠組みに依存する部分が多く、直接適用には調整が必要。
In the global GX context
This case study provides practical evidence for the EU's hydrogen valley strategy, demonstrating how circular economy principles can accelerate project deployment and improve bankability. It offers a model for other regions seeking to repurpose fossil-fuel infrastructure for clean hydrogen while supporting just transition goals.
👥 読者別の含意
🔬研究者:Provides a real-world framework for integrating circular economy with hydrogen projects, linking environmental and financial co-benefits.
🏢実務担当者:Offers concrete operational insights on repurposing industrial sites for hydrogen production and navigating administrative efficiencies.
🏛政策担当者:Illustrates how regulatory circularity mechanisms (e.g., water concessions, permit acceleration) can support hydrogen valley development.
📄 Abstract(原文)
This chapter examines the Asturias H₂ Valley project as a case study in applying circular economy principles to renewable hydrogen production. Located at the Aboño power plant in Spain, the project demonstrates how repurposing existing industrial infrastructure from a coal-fired power plant achieves significant environmental and financial benefits. The analysis frames these benefits as deeply interconnected rather than independent systems: environmental advantages such as CO₂ emission reductions and lower water consumption unlock access to public investment schemes, while administrative efficiencies derived from circular economy principles reduce permitting times and investment costs. Legal circularity mechanisms facilitate water concessions and accelerate permitting processes. This project exemplifies how circular economy strategies enhance project feasibility while supporting Spain&s;s Just Transition framework and broader EU hydrogen valley objectives.
🔗 Provenance — このレコードを発見したソース
- openalex https://doi.org/10.4324/9781003669654-15first seen 2026-07-05 04:44:16
🔔 こうした論文の新着を逃したくない方は キーワードアラート に登録(無料・3キーワードまで)。
gxceed は公開メタデータに基づく研究支援データセットです。要約・翻訳・解説は AI 支援で生成されています。 最終的な解釈・検証は利用者が原典資料に基づいて行うことを前提とします。