インテリジェント木造構造建設工場のBIMベース統合管理システム:生産最適化と炭素排出モニタリング
BIM-Based Integrated Management System for Intelligent Timber Structure Construction Factories: Production Optimization and Carbon Emission Monitoring (原題)
Long Zhang, Guowen Zhang, 文涛 乔, Yiqiang Li, 熊清清
🤖 gxceed AI 要約
日本語
炭素ピークアウト・カーボンニュートラル目標を背景に、木造建築のプレファブ工場向けBIM駆動型統合管理システムを提案。精緻な生産管理と炭素排出モニタリングを組み合わせたアーキテクチャと管理プラットフォームを構築し、原材料調達から製品出荷までのデジタル閉ループ管理と全チェーン炭素排出量の定量化を実現する。実工場での適用により実現可能性と工学的適用性を実証した。
English
Proposes a BIM-driven integrated management system for smart timber-structure prefabrication factories, combining refined production management with carbon emission monitoring. The platform enables full-process digital closed-loop management from raw material procurement to finished-product shipment, plus full-chain carbon quantification. A practical factory application demonstrates feasibility and engineering applicability.
Unofficial AI-generated summary based on the public title and abstract. Not an official translation.
📝 gxceed 編集解説 — Why this matters
日本のGX文脈において
建設業のScope 3排出量(建材調達・施工)管理がSSBJ・有報開示で重要性を増す中、木造プレファブ工場でのBIM連携炭素モニタリングは、サプライチェーン上流の排出データ整備と一次データ活用の実務例として参考になる。
In the global GX context
As CSRD/ISSB push for Scope 3 upstream construction-material data, this BIM-integrated carbon monitoring in prefabrication factories offers a practical example of primary-data capture at the supplier level, relevant to embodied-carbon disclosure and green-building procurement.
👥 読者別の含意
🔬研究者:BIMと炭素会計を統合した工場レベル管理の設計手法と、実装検証の枠組みを参考にできる。
🏢実務担当者:建材プレファブ工場での調達から出荷までの炭素データ収集・可視化の仕組みづくりに活用できる。
🏛政策担当者:建設業の上流排出データ整備や低炭素建材調達政策の設計に示唆を与える。
📄 Abstract(原文)
Driven by the carbon peaking and carbon neutrality goals, the construction industry is facing an increasingly urgent demand for low-carbon transformation. As a major form of green building, timber structures require improved digital collaboration in production and more refined carbon emission management. To address this issue, this study proposes a novel integrated management system for the intelligent management of smart timber construction factories. The system develops a BIM-driven production and fabrication mode, constructs an integrated management architecture combining refined production management and carbon emission monitoring, and establishes a corresponding management platform. The platform enables full-process digital closed-loop management from raw material procurement to finished-product shipment, as well as full-chain carbon emission quantification. A practical application in a prefabrication factory demonstrates the feasibility, effectiveness, and engineering applicability of the proposed method and system.
🔗 Provenance — このレコードを発見したソース
- openalex https://icj-e.org/index.php/ojs/article/view/456first seen 2026-10-22 05:00:30 · last seen 2026-11-06 05:03:17
🔔 こうした論文の新着を逃したくない方は キーワードアラート に登録(無料・3キーワードまで)。
gxceed は公開メタデータに基づく研究支援データセットです。要約・翻訳・解説は AI 支援で生成されています。 最終的な解釈・検証は利用者が原典資料に基づいて行うことを前提とします。