人間とコボットの協働生産スケジューリング、オンサイト太陽光発電、蓄電池を同時に最適化するリスク考慮型モデルを開発。CVaRと1000シナリオのモンテカルロで5戦略を比較した。リスク中立型は平均日次コストを59.2%、排出を46.1%削減し生産遅延も回避。リスク考慮型はCVaR95をさらに2.6%改善するが平均コストは4.2%増加した。
English
This study builds a risk-aware co-optimization model linking human–cobot production scheduling, on-site PV generation, and battery storage in a digital-twin-ready (offline prescriptive) setting. Using MILP with CVaR and 1000 Monte Carlo daily scenarios, five strategies were compared. Risk-neutral co-optimization cut mean daily cost 59.2%, emissions 46.1%, and grid use 48.3% without delaying production; risk-aware optimization further reduced CVaR95 cost 2.6% at a 4.2% mean-cost increase. Viability remains site-specific.
Unofficial AI-generated summary based on the public title and abstract. Not an official translation.
📝 gxceed 編集解説 — Why this matters
日本のGX文脈において
日本の製造業が工場の脱炭素と電力コスト管理を両立させる際、生産計画と再エネ・蓄電池を統合する実務的枠組みを提供する。デジタルツイン化やSSBJ対応のScope1/2削減策の設計に示唆を与える。
In the global GX context
Adds to global industrial decarbonization scholarship by quantifying how scheduling flexibility and explicit risk aversion interact in on-site PV-plus-storage manufacturing, relevant to Scope 2 accounting and corporate transition planning under ISSB/CSRD.
👥 読者別の含意
🔬研究者:生産スケジューリングと再エネ・蓄電池の協調最適化にCVaRを組み込む定式化の実例として参考になる。
🏢実務担当者:工場の再エネ・蓄電池導入と生産計画の統合により、コストと排出の同時削減余地を評価する枠組みとして使える。
🏛政策担当者:産業の電力柔軟性がエネルギー転換の資源になり得る点を、需要側政策の設計に反映する材料となる。
📄 Abstract(原文)
The increasing penetration of variable renewable energy requires industrial facilities to manage energy supply, production flexibility, and cost exposure simultaneously. This study develops a risk-aware model for the co-optimization of human–cobot production scheduling, on-site photovoltaic generation, and battery energy storage within a digital-twin-ready decision environment. The artifact is an offline prescriptive model; it is not connected to a physical production system and does not include automatic or real-time data exchange. A two-stage computational experiment was conducted using mixed-integer linear programming with conditional value-at-risk and an out-of-sample Monte Carlo simulation comprising 1000 independent daily scenarios of electricity prices, photovoltaic generation, and grid carbon intensity. Five strategies were compared: grid-only supply, photovoltaic generation, photovoltaics with battery storage, risk-neutral co-optimization, and risk-aware co-optimization. Relative to the modeled baseline, the risk-neutral variant reduced mean daily operating cost by 59.2%, operational emissions by 46.1%, and grid-energy use by 48.3%, without delaying production. The risk-aware variant reduced the CVaR95 of daily cost by a further 2.6% relative to the risk-neutral solution, at a 4.2% increase in mean cost. These percentages are scenario-specific operational effects rather than plant-level, annual, or life-cycle estimates. A screening-level investment assessment indicates that economic viability remains contingent on site-specific capital costs, operating days, tariffs, and implementation expenditure. The findings show that scheduling flexibility is a resource of energy transition, while risk aversion should be calibrated explicitly as a managerial decision.
🔗 Provenance — このレコードを発見したソース
- openalex https://doi.org/10.3390/su181910065first seen 2026-10-23 05:07:48 · last seen 2026-11-01 04:33:53
🔔 こうした論文の新着を逃したくない方は キーワードアラート に登録(無料・3キーワードまで)。
gxceed は公開メタデータに基づく研究支援データセットです。要約・翻訳・解説は AI 支援で生成されています。 最終的な解釈・検証は利用者が原典資料に基づいて行うことを前提とします。