パラメトリック設計・実測検証済み温熱シミュレーション・ライフサイクル評価の統合による初期段階の低炭素外皮意思決定:高温乾燥気候における実大塩レンガパビリオンでのパイロット実証
Integrating parametric design, field-evaluated hygrothermal simulation and life-cycle assessment for early-stage low-carbon envelope decisions: a pilot demonstration on a full-scale salt-brick pavilion in a hot-arid climate (原題)
Aref Mohamad Maksoud, Aseel Ali Hussien, Shouib Nouh Ma’bdeh
🤖 gxceed AI 要約
日本語
Grasshopper上でパラメトリック設計、サロゲート支援最適化、実測キャリブレーション、LCA・コスト評価を統合するCAMEワークフローを提案。ドバイの実大塩レンガパビリオンで実証し、塩空洞の平均作用温度は参照コンクリート壁より3.1℃低く、位相遅れ6.3時間を観測。スクリーニングLCAでは体化炭素が69.7%削減(±50%感度でも62.3%以上)と示した。
English
Presents the CAME workflow integrating parametric design, surrogate-assisted NSGA-II optimisation, field monitoring and calibrated EnergyPlus simulation with screening LCA and costing. A full-scale Himalayan salt-brick pavilion in Dubai showed mean operative temperature 3.1°C below a concrete reference with a 6.3-h phase shift, and 69.7% lower embodied carbon (≥62.3% under ±50% sensitivity). Evidence-status classifications are explicitly assigned.
Unofficial AI-generated summary based on the public title and abstract. Not an official translation.
📝 gxceed 編集解説 — Why this matters
日本のGX文脈において
建築物の体化炭素削減はScope 3カテゴリ1・2やSSBJのサプライチェーン排出把握と直結する論点。日本でもZEB・木造化・低炭素建材選定の初期設計判断に応用可能な手法として参考になる。
In the global GX context
Embodied-carbon screening at early design stages feeds directly into Scope 3 category 1/2 accounting and building-sector disclosure under ISSB/CSRD. The workflow's explicit evidence-status labelling is a useful model for how disclosure-ready data quality can be flagged in LCA-based claims.
👥 読者別の含意
🔬研究者:実測キャリブレーションとサロゲート最適化をLCA・コストと統合する手法設計の参考になる。
🏢実務担当者:初期設計段階で熱・炭素・コストの比較スクリーニングを一括実施する枠組みとして活用できる。
🏛政策担当者:建材・外皮の低炭素化評価における証拠格付けとコード適合要件の整理に示唆を与える。
📄 Abstract(原文)
Purpose This study pilot-demonstrates the Climate-Adaptive Mineral Envelope (CAME) workflow, integrating fragmented analytical tools within Grasshopper to support low-carbon envelope decisions for hot-arid construction.Design/methodology/approach A discretised Schwarz P envelope underwent structural verification and NSGA-II optimisation using a Gaussian-process surrogate trained on 120 EnergyPlus simulations. A Pareto-knee configuration was built as a 3,000-brick Himalayan salt pavilion exhibited at Dubai Design Week 2024. Nine-day monitoring of operative and surface temperatures and relative humidity informed calibration of an EnergyPlus model using the Effective Moisture Penetration Depth algorithm. Screening life-cycle assessment (LCA) and costing completed the work flow.Findings Surrogate RMSE was 0.38 °C under leave-one-out cross-validation and 0.42 °C across six out-of-sample simulations. Calibrated model RMSE was 1.06–1.31 °C, with CV(RMSE) of 3.4–3.6%. NMBE was not calculated, precluding full ASHRAE Guideline 14 compliance claims. Mean operative temperature in the salt cavity was 3.1 °C below the concrete-masonry-unit reference, with a 6.3-h phase shift and 0.43 decrement factor. These contrasts are descriptive because observations were serially correlated, monitoring covered one pavilion and one panel, and cavity-node convective exposure was unquantified. Screening LCA indicated 69.7% lower embodied carbon, remaining ≥62.3% across a ±50% sensitivity band.Originality/value The workflow connects parametric design, surrogate-assisted optimisation, fabrication, monitoring and calibrated simulation with carbon and cost screening, assigning explicit evidence-status classifications.Practical implications Comparative thermal, carbon and cost screening is delivered within one working session. Permanent salt-envelope application requires binder redesign, deliquescence-resistant detailing and code-compliance evidence.
🔗 Provenance — このレコードを発見したソース
- openalex https://doi.org/10.1080/17452007.2026.2747380first seen 2026-10-19 05:00:26
🔔 こうした論文の新着を逃したくない方は キーワードアラート に登録(無料・3キーワードまで)。
gxceed は公開メタデータに基づく研究支援データセットです。要約・翻訳・解説は AI 支援で生成されています。 最終的な解釈・検証は利用者が原典資料に基づいて行うことを前提とします。